From GAWDAwiki

Jump to: navigation, search
We need your help. In order to provide you with more regional news and information, please provide your Zip Code in the box at right and press Go. Thank you!
Zip Code:  
Home | Headlines | 4-Mile LNG Pipe Planned

Headlines

4-Mile LNG Pipe Planned

- 6/8/2009
Fall River, MA – A four-mile cryogenic pipeline to bring liquefied natural gas upriver being is being planned for Fall River, Massachusetts. If constructed, it would be the longest LNG pipeline in the world.

The planned pipeline is the result of Weaver's Cove Energy's desire for a LNG farm. The pipeline would solve the problem of ship navigation, as LNG ships would not have to dock at the onshore facility. Ships could stop at a platform miles away and deliver their cargo through the pipeline.

Despite criticisms, Weaver President Gordon Shearer maintains that ultra-insulated double-walled "pipe-in-a-pipe" construction means that LNG can be safely moved up to six miles without there being a problem with it beginning to boil off because of thermal radiation or friction-creating heat.

Read the full story at southcoasttoday.com.
Bookmark and Share
 0 Comment(s) Post a Comment 
 Be the first to comment on this item.

 Comment on this item:
Name:
Company:
Email:
Comment:
Security Code: CAPTCHA Image Reload Image
Enter the text shown in the box above.
Comments that include profanity, personal attacks or antisocial behavior such as "spamming," "trolling," or any other inappropriate material will not be posted to the site and/or will be removed from the site. You are fully responsible for the content you post. Neither the Association nor the publisher of this website, Data Key Communications, Inc, are responsible for the contents thereof or the opinions of the contributors. Contact and company information entered must be true and accurate. By submitting a comment, you agree to these terms and conditions.
More Headlines Showing Page 1 of 272
Next›   Last››
11/27/2012Welding Begins on Oregon Rail Project ...more | comments
Welders will connect two, 80-foot lengths of rail by a thermite welding process that superheats aluminum, iron oxide and alloy elements to produce molten steel and permanently join the rails.
11/27/2012Airgas Chairman Sells 1.2 Million Shares ...more | comments
Peter McCausland sells 1.2 million shares of Airgas common stock in privately negotiated overnight block trade.
11/27/2012New Gas Process for Controlled Ripening ...more | comments
Researchers set to revolutionize fresh fruit industry with new technology that converts ethylene gas into a powder form.
11/26/2012Specialty Gas Growth Projections ...more | comments
Report indicates slow and modest growth.
11/26/2012ITW Names Successor ...more | comments
David Speer, ITW chairman and CEO, dies after illness. Scott Santi named successor.
11/26/2012Cee Kay Supply Healthy Employer Finalist ...more | comments
Wellness program improves worker health.
11/21/2012Lucas-Milhaupt Acquires Inmet ...more | comments
Company buys alloy maker and expands product line.
11/21/2012LNG Plant For Southwest Florida ...more | comments
Air Products to build LNG plant in Florida.
11/21/2012Low-Supply Helium Makes Parade Appearance ...more | comments
Should we be wasting our dwindling supply of helium on floating cartoon characters?
11/14/2012Lincoln Acquires Three Businesses ...more | comments
Lincoln acquires shape cutting and engineered systems businesses.